The First Group’s largest hotel property to open in Barsha Heights to date, TRYP by Wyndham Dubai is one of Barsha Heights’ hippest urban lifestyle destinations. With 675 guestrooms and suites, it is also the world’s largest TRYP hotel and offers deluxe leisure facilities including a pool and gym; an innovative pop-up shop concept; ‘VYP’ Lounge for VIP guests and Premium Wyndham Rewards members; and multi-purpose meeting and event venues, including the NEST co-working space. Named ‘Four-Star Hotel of the Year’ at the prestigious Middle East Hospitality Awards 2018, the property has also carved a niche as a dining and nightlife destination, with Local Social Kitchen & Bar and BARBARY Deli + Cocktail Club proving extremely popular with guests and local residents alike.
TRYP by Wyndham Dubai ranks among Barsha Heights’ most popular hotels, as proven by its strong and consistent occupancy rates. Barsha Heights is one of Dubai’s most popular destinations for business and leisure visitors thanks to its prime location and convenient transportation links.
With some of the most eclectic collection of F&B offerings TRYP by Wyndham has forged its reputation as one of the city’s premier dining and nightlife destinations. Boasting a lush 1920s’ Parisian-themed interior design, TRYP’s award-winning and hugely popular BarBary Deli + Cocktail Bar is unlike anything else in Dubai. The hotel’s popular rustic social eating house, Local, and poolside bar, L!QD, which serves delicious tapas and lifestyle-focused cocktails in a chic, Ibiza-inspired al fresco environment, have also proven a hit with discerning diners.
PREMIUM F&B OUTLETS
Award-winning restaurants and bars
AWARD WINNER
Three international industry awards to date
1st
Ranking as world’s largest TRYP By Wyndham Hotel
Gallery
TRYP By Wyndham - the exterior at night
TRYP by Wyndham Dubai - Family Room
TRYP by Wyndham Dubai - Family Room
TRYP by Wyndham Dubai - Family Room
TRYP by Wyndham Dubai - Gym and Fitness Centre
TRYP by Wyndham Dubai - Gym and Fitness Centre
TRYP by Wyndham Dubai - LIQD Tapas Bar
TRYP by Wyndham Dubai - LIQD Tapas Bar
TRYP by Wyndham Dubai - LIQD Tapas Bar
TRYP by Wyndham Dubai - Outside Terrace
TRYP by Wyndham Dubai - Outside Terrace
TRYP by Wyndham Dubai - Outside Terrace
TRYP by Wyndham Dubai - Local Restaurant
TRYP by Wyndham Dubai - Local Restaurant
TRYP by Wyndham Dubai - NEST Business Centre
TRYP by Wyndham Dubai - NEST Business Centre
TRYP by Wyndham Dubai - Swimming Pool
TRYP by Wyndham Dubai - Premium Room
TRYP by Wyndham Dubai - Reception
TRYP by Wyndham Dubai - TRYP Room
TRYP by Wyndham Dubai - VYP Premium Room
TRYP by Wyndham Dubai - VYP Premium Room
TRYP by Wyndham Dubai - VYP Premium Room
TRYP by Wyndham Dubai - VYP TRYP Room
TRYP by Wyndham Dubai - VYP TRYP Room
TRYP by Wyndham Dubai - VYP TRYP Room
TRYP by Wyndham Dubai - VYP TRYP Room
TRYP by Wyndham Dubai - Accessible Guest Room
TRYP by Wyndham Dubai - Breakfast Space
TRYP by Wyndham Dubai - Breakfast Space
TRYP by Wyndham Dubai - Night View
TRYP by Wyndham Dubai - Night View
FACILITIES
24 Hour Reception
24/7 reception and concierge services
Valet Parking
Complimentary valet parking service
NEST Co-Working Space
Modern, high-tech co-working facilities for business clients
Laundry Service
24/7 laundry service
Wi-Fi
Complimentary high-speed internet access
World-class Dining Facilities
A fine selection of restaurants, cafes and bars
Swimming Pool
Luxury swimming pool and sundeck
Gymnasium
Fully-equipped fitness centre
Satellite Television
Local and international digital channels
Booking Facilities
Tour and leisure activity booking services
Preview TRYP by Wyndham
Construction Timeline
More Information
The waterproofing process for the raft area has been completed using 1 coat of bitumen, 2 layers of 4mm SBS membrane, 6mm Protection board for vertical area and 5cm concrete screed for horizontal area.
7 cm of (30/10 OPC screed) was casted all over the raft area.
Setting out of columns and second tower crane points are completed.
Setting out of Water Tank, Retaining Wall and Core Wall points are completed.
Fixing bottom steel mesh for raft foundation is completed.
40% of the upper steel mesh for raft foundation is fixed.
The ID is working on finalizing the interior designs for the units, the lobby and common areas.
The ID team has completed the furniture layouts for all the units, lobby and the common areas.
More Information
The waterproofing process for the raft area has been completed using 1 coat of bitumen, 2 layers of 4mm SBS membrane, 6mm Protection board for vertical area and 5cm concrete screed for horizontal area.
7 cm of (30/10 OPC screed) was casted all over the raft area.
Setting out of columns and second tower crane points are completed.
Setting out of Water Tank, Retaining Wall and Core Wall points are completed.
Fixing bottom steel mesh for raft foundation is completed.
40% of the upper steel mesh for raft foundation is fixed.
The ID is working on finalizing the interior designs for the units, the lobby and common areas.
The ID team has completed the furniture layouts for all the units, lobby and the common areas.
The steel reinforcement works for the raft foundation have been completed.
The approval to cast the raft foundation has been granted; the contractor is working towards the final preparation for pouring the concrete which is expected to commence in the coming days.
The ID team is working on finalizing the interior designs for the units, the lobby and common areas.
The contractor is in his final preparation to cast the raft foundation slab; the pouring of concrete is expected to commence on 26/09/2013.
The Interior Design team is working on finalizing the interior designs for the units, the lobby and common areas in consultation with our partner Wyndham hotels.
More Information
The contractor is in his final preparation to cast the raft foundation slab; the pouring of concrete is expected to commence on 26/09/2013.
The Interior Design team is working on finalizing the interior designs for the units, the lobby and common areas in consultation with our partner Wyndham hotels.
During the past week, a total of 750 cement trucks worked for 60 consecutive hours to pour the concrete for the raft foundation.
Curing (watering) of the concrete for the raft foundation is on-going
Work on the steel reinforcement and shutter works for the columns of the 1st basement is on-going
The 1st basement floor slab, is expected by the end of the month
The cast of the project’s enormous raft foundation slab was completed on the 29th of September, 2013; the pouring of almost 6,500 cubic meter commenced in the early hours of the 27th and it was a nonstop operation which lasted for two days and nights.
The Interior Design team is working on finalizing the interior designs for the units, the lobby and common areas in consultation with our partner Wyndham hotels.
The contractor is expecting to have the building permit from Tecom to cast the 1st basement slab in a few days; the preparation works have been completed.
The Interior Design team is working on finalizing the floors’ plans, interior designs for the units, the lobby and common areas in consultation with our partner Wyndham hotels.
Approximately one thousand cubic metres of concrete was used last week to complete the cast of the first basement slab of the hotel.
The preparation work to cast the ground floor slab is progressing rapidly to support a pour of concrete within first two weeks of January 2014.
The First Group renowned Interior Design team is engaged in meeting with Wyndham Hotel management team to finalize design concepts utilizing the finest materials carefully selected to exceed the expectations of the most discerning clients.
More Information
The contractor has obtained the substructure permit from Tecom. That will allow him to cast slabs up the Ground floor slab.
The cast of the 1st basement slab was completed.
Half of the ground floor slab is complete; the concrete pouring for the other half will commence in one week.
Design Progress: Working on VIP visuals for Marketing. Under review with the operator.
Design Progress: Studying spaces for the amenities and back of house requirements.
The contractor has obtained the substructure permit from Tecom.
The cast of the 1st basement slab was completed.
The ground floor full slab has been completed.
Block work of the entire substructure is completed.
Waterproofing of the exterior retaining wall has been completed.
Backfilling of the entire site started already has been completed.
Design Progress: The renders for the VIP units have been completed and it is under review with the operator.
Design Progress: A number of options with regard to the spaces for the amenities and back of house requirements have been given to the operator for their review.
The contractor has obtained the building permit for the full building from TECOM on 6th of March, 2014.
The cast of the 1st floor slab has been completed on the 16th of March, 2014 (it is the roof of 1st floor).
The cast of the 2nd floor slab is scheduled for next week commencing Monday, the 7th of April, 2014.
Design Progress: The operator has submitted has concept design brief for TRYP brand.
Design Progress: TFG Interior Design team presented the designs concepts for the standard and VIP guestrooms which have been approved by the operator.
Design Progress: The studies of spaces for the amenities and back of house requirements have been concluded.
Design Progress: Design for common areas is ongoing.
More Information
The contractor has obtained the building permit for the full building from TECOM on 6th of March, 2014.
The cast of the 1st floor slab has been completed on the 16th of March, 2014 (it is the roof of 1st floor).
The cast of the 2nd floor slab is scheduled for next week commencing Monday, the 7th of April, 2014.
Design Progress: The operator has submitted has concept design brief for TRYP brand.
Design Progress: TFG Interior Design team presented the designs concepts for the standard and VIP guestrooms which have been approved by the operator.
Design Progress: The studies of spaces for the amenities and back of house requirements have been concluded.
Design Progress: Design for common areas is ongoing.
Contractor got on the building permit for construction of the entire company Tecom in March 6, 2014.
Casting has been completed in the floor of the first floor March 16, 2014 (the surface of the first floor).
Work is scheduled to pour the floor of the second floor next week beginning from Monday, 7 April 2014.
Design process: the operator to send the conceptual design for TRYP by Wyndha,. Interior design team made a firm TFG conceptual designs approved by the operator of the standard rooms and rooms dignitaries.
The completion of the special requirements of space studies background and recreational places of interest. Work is under way on the design of public spaces
We are delighted to be able to report that we have been working with Wyndham, the appointed operator for Sky Central under their TRYP brand in order to ensure that Sky Central becomes and iconic addition to the Tecom skyline. To that end we have determined that the addition of four extra floors will help in that objective. This will help to give the “TRYP by Wyndham” becomes a worthy launch project for this important new brand in Dubai and the UAE.
In order for us to achieve this objective our design consultants have had to change the full set of contract drawings and resubmit them to the relevant authorities in order to obtain the required, revised approvals. During the submittal process we have been focusing on preparing the site for construction of the typical floors and have recently completed the construction of the two, large podium levels as well as the necessary below ground works. We are now ready to commence with the construction of the typical floors which can be constructed at the rate of 2- 3 floors per month.
The first of the necessary approvals has already been obtained from the Tecom zoning department and the revised building permit with the 4 additional floors included is expected to be obtained in the coming few days.
Visitors to the site will see some major changes in the coming 10 days or so as we install a new and larger tower crane that can cope with the additional height, an enhanced visitor Centre for our clients and rapid construction progress as the building starts to “reach for the sky”!
Design Progress: Integration of the operator (TRYP) concept throughout the hotel is being carefully considered so as to ensure that the interior design is done in line with their branding.
More Information
Taking account of Wyndham’s recommendations, (the appointed operator for Sky Central) to add four extra floors in order to support Sky Central becoming an iconic addition to the Tecom skyline, The First Group management decided that changes at the construction site has to be made in order to rise to this challenge; therefore a new contractor with a high profile has been appointed to execute the remaining construction works at the site. This appointment will ensure that the “TRYP by Wyndham” becomes a worthy launch project for this important new brand in Dubai and the UAE.
In furtherance of this the first of the necessary approvals has already been obtained from Tecom’s relevant departments for the appointment of the new contractor and they have already commenced their work.
The new contractor has completed his mobilization to the site and work has already commenced.
The columns of the 3rd floor slab have been completed.
The shuttering and the steel works for the 3rd slab are in progress; the expected date to cast this slab is 12th of August, 2014.
Our aim for the construction of the typical floors is to construct 2- 3 floors per month. This progress will be witnessed from the 4th slab onwards.
Visitors to the site will see some major changes in the coming days as we install a new and larger tower crane that can cope with the additional height, an enhanced Visitor Centre for our clients and rapid construction progress as the building starts to “reach for the sky”!
Design Progress: Integration of the operator (TRYP) concept throughout the hotel is being carefully undertaken so as to ensure that the interior design is done in line with their branding.
The cast of the 3rd floor slab was completed on the 30th of August, 2014.
The shuttering and steel works for the columns of the 4th floor slab are in progress.
We expect to cast the 4th slab on the 15th of September, 2014.
Block works have started in basement and will commence in the 1& 2 floors during the 3rd week of Sep, 2014.
The First Group Interior Design team is working on producing the required design’s drawings based on the operator (TRYP) concept.
A design team committee from both sides has been formed to review and approve the Interior Design works to ensure that are in line with the operator’s branding requirements.
The casting of the 4th floor slab was completed on 18/9/2014.
The casting of the 5th slab is due imminently. Currently the contractor is completing 2 slabs per a month; our target is to increase this to 3 slabs per month. We will be achieving this milestone during October, 2014.
The concrete pouring of the 5th floor columns has been completed.
Block works in the basements will commence during the 2nd week of Oct, 2014.
Design Progress: The First Group Interior Design team has prepared and submitted the Interior Design’s drawings to our interior designer consultant for his review and input. These drawings were produced based on the operator (TRYP) concept. The Interior Design consultant and our in house design team’s main aim is to ensure that the units’ interior design concept is in line with the operator branding requirements.
More Information
The casting of the 4th floor slab was completed on 18/9/2014.
The casting of the 5th slab is due imminently. Currently the contractor is completing 2 slabs per a month; our target is to increase this to 3 slabs per month. We will be achieving this milestone during October, 2014.
The concrete pouring of the 5th floor columns has been completed.
Block works in the basements will commence during the 2nd week of Oct, 2014.
Design Progress: The First Group Interior Design team has prepared and submitted the Interior Design’s drawings to our interior designer consultant for his review and input. These drawings were produced based on the operator (TRYP) concept. The Interior Design consultant and our in house design team’s main aim is to ensure that the units’ interior design concept is in line with the operator branding requirements.
The casting of the 6th floor slab was completed on 28/10/2014.
The casting of the 7th slab is due imminently. Currently the contractor is completing 3 slabs per a month; this was the target which we anticipated achieving by the end of Oct, 2014 and we did.
The concrete pouring of the 6th floor columns has been completed.
Block works are in progress up to the 3rd floor.
Design Progress: The First Group Interior Design team is working on the ideas received from our Interior design consultant with regard to the Interior Design drawings which were produced based on the operator’s (TRYP) concept.
Design Progress: A show flat unit is under preparation by the contractor based on the Interior Design suggested; the unit should be ready by the middle of Dec, 2014. The Interior design consultant and our in house design team’s main aims are to ensure that the units’ interior design concept is in line with the operator’s branding requirements.
The casting of the 9th floor slab was completed on 22/11/2014.
The casting of the 10th slab is due on the 1st of Dec, 2014. Since Oct, 2014 the contractor has been completing 3 slabs per month; this is in line with the target rate which we anticipated achieving by the end of Oct, 2014.
Block works are in progress up to the 4th floor.
The curtain wall works contract (Aluminum, Glazing and glass) has been awarded.
Design Progress: The ID team is working on the ideas received from the operator based on TRYP’s concept.
Design Progress: A show flat unit is under preparation by the contractor. The unit should be ready by the middle of Dec, 2014. Our main aim is to ensure that the unit’s interior design concept is in line with the operator’s branding requirements.
The casting of the 13th floor slab was completed on 30/12/2014.
The casting of the 14th slab is due on the 10th of Jan, 2015. Since Oct, 2014 the contractor has been completing 3 slabs per month; this is in line with the target rate which we anticipated achieving by the end of Oct, 2014.
Block works are in progress up to the 7th floor.
A show flat unit has been prepared by the contractor.
The show flat unit has been inspected by the operator and minor comments were highlighted; we are currently working on these comments.
More Information
The casting of the 13th floor slab was completed on 30/12/2014.
The casting of the 14th slab is due on the 10th of Jan, 2015. Since Oct, 2014 the contractor has been completing 3 slabs per month; this is in line with the target rate which we anticipated achieving by the end of Oct, 2014.
Block works are in progress up to the 7th floor.
A show flat unit has been prepared by the contractor.
The show flat unit has been inspected by the operator and minor comments were highlighted; we are currently working on these comments.
The casting of the 16th floor slab was completed on 30/01/2015.
The casting of the 17th slab is due on the 8th of Feb, 2015.
The concrete pouring of 50% of the 17th floor columns has been completed. The contractor is working on the remaining 50%.
Block works are in progress up to the 9th floor.
The show flat has been inspected by the operator; minor comments we highlighted.
A new show flat covering the operator’s comments is under preparation by the contractor.
The curtain wall works (Glass& Aluminum) has been award.
Design Progress: The revised furniture layout has been finalized with the operator.
Design Progress: Typical corridor carpet design is on progress, samples have been requested from suppliers.
Design Progress: Family room proposal and new color scheme have been issued to the operator.
Design Progress: Commercial kitchen layout has been sent to the consultant based on the operator’s request.
Design Progress: Fitness rooms equipment has been chosen
The casting of the 22nd floor slab was completed on 31/03/2015.
The casting of the 23rd slab is due on the 9th of April, 2015.
Block works are in progress up to the 16th floor.
The show flat has been inspected by the operator; minor comments were highlighted.
A new show flat incorporating the operator’s comments is under preparation by the contractor. This is expected to be ready by the end of April, 2015.
The curtain wall works (Glass& Aluminum) have commenced
The revised furniture layout has been finalized with the operator.
Typical corridor carpet samples have been provided. Waiting for the operator viewing and approval.
Family room interior design proposal with a new color scheme have been approved by the operator.
More Information
The casting of the 22nd floor slab was completed on 31/03/2015.
The casting of the 23rd slab is due on the 9th of April, 2015.
Block works are in progress up to the 16th floor.
The show flat has been inspected by the operator; minor comments were highlighted.
A new show flat incorporating the operator’s comments is under preparation by the contractor. This is expected to be ready by the end of April, 2015.
The curtain wall works (Glass& Aluminum) have commenced
The revised furniture layout has been finalized with the operator.
Typical corridor carpet samples have been provided. Waiting for the operator viewing and approval.
Family room interior design proposal with a new color scheme have been approved by the operator.
The casting of the 25th floor slab was completed on 28/04/2015.
The casting of the 26th floor slab is due on 05/05/2015.
Block works are 100% complete from the 3rd floor up to the 12th floor and in progress from the 13th to the 20th floor.
Plaster works are in progress from the 3rd to the 12th floor.
The MEP & Electrical works are in progress up to the 23rd floor.
The curtain walling and aluminum works are in progress up to the 10th floor.
Design Progress: The new show flat incorporating the operator’s comments along with displayed furniture will be viewed by the operator early next month.
Design Progress: The First Group Interior Design team is working on getting all the F&B outlets designed and approved by the operator.
Design Progress: Family room proposal and new color scheme have been approved by Wyndham.
Design Progress: Commercial kitchen design has been approved by the operator.
The casting of the 27th floor slab was completed on 26/05/2015.
The casting of the 28th floor slab is due on 07/06/2015.
Block works are 100% complete from the 3rd floor up to the 14th floor and in progress from the 15th to the 24th floor.
Plaster works are in progress from the 3rd to the 14th floor.
The MEP & Electrical works are in progress up to the 24th floor.
The curtain walling and aluminum works are in progress up to the 16th floor.
Design Progress: The new show flat incorporating the operator’s earlier comments along with displayed furniture was approved by the operator.
Design Progress: The First Group Interior Design team will present the F&B outlets designs to the operator for their review and approval by the end of June, 2015.
The casting of the 28th floor slab was completed on 6/06/2015.
Block works are 100% complete from the 3rd floor up to the 20th floor and in progress from the 21st to the 26th floor.
Plaster works are 100% complete from the 3rd to the 7th floor and in progress from the 8th to the 16th
The MEP and Electrical works are in progress up to the 26th floor.
The curtain walling and aluminum works are in progress up to the 20th floor.
The new show flat incorporating the operator’s earlier comments along with displayed furniture was approved by the operator.
The First Group Interior Design team has presented the F&B outlets designs to the operator for their review and approval.
More Information
The casting of the 28th floor slab was completed on 6/06/2015.
Block works are 100% complete from the 3rd floor up to the 20th floor and in progress from the 21st to the 26th floor.
Plaster works are 100% complete from the 3rd to the 7th floor and in progress from the 8th to the 16th
The MEP and Electrical works are in progress up to the 26th floor.
The curtain walling and aluminum works are in progress up to the 20th floor.
The new show flat incorporating the operator’s earlier comments along with displayed furniture was approved by the operator.
The First Group Interior Design team has presented the F&B outlets designs to the operator for their review and approval.
The casting of the roof top slab was completed on 10/07/2015.
Block works are 100% complete from the 3rd floor up to the 24th floor and in progress in the 25th, 26th and the 27th floors.
Plaster works are 100% complete from the 3rd to the 12th floor and in progress from the 13th to the 19th.
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 26th floor. 50% of the total façade aluminum and glass works are completed.
Design Progress: The new show flat incorporating the operator’s earlier comments along with the displayed furniture was approved by the operator.
Design Process: The F&B outlets designs have been approved by the operator. The First Group Interior design team is preparing the detailed drawings for these approved designs.
Block works are 100% complete from the 3rd floor up to the 26th floor and in progress in the 27th floors.
Plaster works are 100% complete from the 3rd to the 16th floor and in progress from the 17th to the 22nd.
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 60% of the total façade aluminum and glass works are now completed.
Design Progress: The F&B outlets designs have been approved by the operator. The First Group Interior design team has prepared the detailed drawings for these approved designs. The drawings have been handed over to the contractor to commence with the execution of the work as per the agreed program.
Block works are 100% complete from the 3rd floor up to the 27th floor.
Plaster works are 100% complete from the 3rd to the 21st floor and in progress from the 22nd to 25th.
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 70% of the total façade aluminum and glass works are now completed.
The First Group Interior design team is working on the final stage of the concept design for the following areas:
The business center.
The main lobby.
The GYM and SPA.
The Terrace restaurant.
More Information
Block works are 100% complete from the 3rd floor up to the 27th floor.
Plaster works are 100% complete from the 3rd to the 21st floor and in progress from the 22nd to 25th.
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 70% of the total façade aluminum and glass works are now completed.
The First Group Interior design team is working on the final stage of the concept design for the following areas:
The business center.
The main lobby.
The GYM and SPA.
The Terrace restaurant.
Block works are 100% complete in the whole building.
Plaster works are 100% complete from the 3rd to the 24th floor and in progress from the 25th. To the 27th
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 80% of the total façade aluminum and glass works are now completed.
The First Group Interior design team has submitted the concept design for the following areas to the operator for their review and approval: The business center, The main lobby, The GYM and SPA, The Terrace restaurant.
Block works are 100% complete in the whole building.
Plaster works are 100% complete from the 3rd to the 26th floor and in progress at the 27th floor.
The MEP and Electrical works are in progress up to the 27th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 87% of the total façade aluminum and glass works are now completed.
Block works are 100% complete in the whole building.
Plaster works are 100% complete from the 3rd to the 26th floor and in progress at the 27th floor.
The MEP and Electrical works are in progress up to the 27th floor.
The tile work for the walls in the wet areas is in progress up to the 26th floor.
The floors’ tiling work is in progress up to the 17th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 90% of the total façade aluminum and glass works are now completed.
The First Group Interior design team has incorporated all the comments received from the operator and re issued the design drawings to them for the following areas: The business center, The main lobby.
VIP mock up room has been approved by Wyndham with minor comments. The First Group interior design team has addressed those comments with the project’s consultant and contractor.
More Information
The MEP and Electrical works are in progress in the whole building.
The tile work for the walls in the wet areas is in progress up to the 26th floor.
The floors’ tiling work is in progress up to the 19th floor.
The curtain walling and aluminum works are in progress up to the 27th floor. 93% of the total façade aluminum and glass works are now completed.
Two mockup rooms, one standard type and one VIP type have been prepared and completely fitted out.
Design Progress - The operator has approved the designs proposed by the First Group Interior design team for the following areas: The business center and the main lobby.
The First Group interior design team is working on the design of the all-day dining restaurant and the other Food and Beverage outlets.
The furniture package drawings and BOQ has been issued to the nominated furniture factories based on the approved designs/show flats by the operator, Wyndham. Expecting to receive the offers by the 14th of March, 2016.
The main lobby and All Dinning restaurant fit out package has been issued to the nominated fit-out contractors based on approved designs by Wyndham. Expecting to receive the offers by the 14th of March, 2016.
All public bathrooms designs have been approved by Wyndham.
The Gym and Spa designs have been approved by Wyndham and the same have been issued to the main contractor for execution.
The Pool Bar design has been approved by Wyndham and the same have been issued to the main contractor for execution.
The meetings rooms and VIP lounge concept design have been approved with minor comments by Wyndham; currently The First Group interior design team is working to develop the designs of the same areas further to meet the operation requirement.
The main bar area is currently under design however the important design elements have been chosen and The First Group interior design team is working to compile them all in one complete concept.
The award of the furniture package is to be finalized during the month of April, 2016.
The main lobby and All-Day Dining restaurant fit out packages have been awarded. The fit out contractor is preparing the shop drawings for our final review and approval prior to the commencement of the work.
The First Group interior design team is working to develop the designs of the VIP Lounge further to meet the operational requirements.
The main bar area design is nearly completed and will be presented to the operator for their review soon.
More Information
The award of the furniture package is to be finalized during the month of April, 2016.
The main lobby and All-Day Dining restaurant fit out packages have been awarded. The fit out contractor is preparing the shop drawings for our final review and approval prior to the commencement of the work.
The First Group interior design team is working to develop the designs of the VIP Lounge further to meet the operational requirements.
The main bar area design is nearly completed and will be presented to the operator for their review soon.
The furniture package has been awarded.
The fit out contractor have commenced with the main lobby and All-Day Dining restaurant fit out work.
The First Group interior design team has developed the design of the VIP Lounge and this will be presented to the operator during the first week of May, 2016 for their review and final approval.
The main bar area design has been presented and approved by the operator.
The main lobby, All Day Dining restaurant and Bar fit out packages have been awarded and the fit out contractor has commenced with the work.
Meetings rooms and VIP lounge final designs are approved by the operator. Soon the fit out works in both areas will commence.
BOH revised design has been approved by the operator and the contractor has already commenced with the work.
The project was certified as being substantially complete on the 26th of June, 2016 as per the letter issued by the project’s consultant.
Empower the government district cooling provider, has commenced with the connection works required for the hotel’s AC.
The civil defense inspection has been scheduled to take a place during the last week of July, 2016.
The project’s consultant and the contractor will commence with the snagging work, the testing and commissioning of the MEP equipment, by the end of July, 2016.
50% of the hotel’s furniture has been manufactured and the balance should be completed by the end of August 2016.
The main lobby, All Day Dining restaurant and bar fit out works are ongoing.
The fit out work at the meetings rooms and VIP lounge final designs have commenced.
Work at the BOH area is ongoing as per the operator’s approved design.
More Information
The project was certified as being substantially complete on the 26th of June, 2016 as per the letter issued by the project’s consultant.
Empower the government district cooling provider, has commenced with the connection works required for the hotel’s AC.
The civil defense inspection has been scheduled to take a place during the last week of July, 2016.
The project’s consultant and the contractor will commence with the snagging work, the testing and commissioning of the MEP equipment, by the end of July, 2016.
50% of the hotel’s furniture has been manufactured and the balance should be completed by the end of August 2016.
The main lobby, All Day Dining restaurant and bar fit out works are ongoing.
The fit out work at the meetings rooms and VIP lounge final designs have commenced.
Work at the BOH area is ongoing as per the operator’s approved design.
Empower the government district cooling provider will complete the connection works required for the hotel’s AC by the end of August, 2016.
The civil defense inspection has been scheduled on 21st of August, 2016.
DEWA, Dubai’s electrical and water authority has inspected the building and approved it.
The project’s consultant and the contractor have commenced with the snagging work and the testing and commissioning of the MEP equipment.
70% of the hotel’s furniture has been manufactured and the balance should be completed by the end of August 2016.
The main lobby, All Day Dining restaurant and bar fit out works are ongoing.
The fit out work at the meetings rooms and VIP lounge final designs have commenced.
Work at the BOH area is ongoing as per the operator’s approved design.
Civil Defense (CD) second inspection was completed. The anticipated date for obtaining the CD certificate is the 15th of September, 2016 however we are pushing to get it before Eid Holidays, by the 8th of September, 2016.
Within 5-7 days from obtaining the CD’s certificate we will have Tecom completion certificate in hand; Tecom engineers have already inspected the building and approved it and therefore can issue their certificate upon receipt of CD certificate.
DEWA inspection was completed and approved, hence we have applied for the power connection to enable the contractor to commence with the AC testing and commissioning; we are expecting to have the building energized at the latest by the 15th of September, 2016.
The snagging and de snagging process has already commenced.
The delivery and installation of the rooms’ furniture will start during the second week of October, 2016 as the floors will partially be handed over from the top floors going downwards; the full process should be completed latest by the end of December, 2016.
The fit out work for the main lobby, all day dining and ground floor bar is ongoing and expected to be completed by the end of October, 2016.
The fit out work for the VIP lounge and meeting rooms shall commence by the end of September, 2016 and should be completed by the end of November, 2016.
All OS&E (operation, supplies and equipment) have been ordered and delivery of the items will be according to the agreed schedule with the operator.
The order for the commercial kitchen equipment has been issued. Delivery and installation will require a maximum of 3 months from the 1st of September, 2016.
Civil Defense completion certificate was issued.
Tecom’s completion certificate was obtained.
The building has permanent power connected now.
The AC testing and commissioning has commenced.
The snagging and de snagging process is ongoing.
The delivery and installation of the rooms’ furniture will start during the second week of October, 2016 as the floors will partially be handed over from the top floors going downwards; the full process should be completed latest by December, 2016.
The fit out work for the main lobby, all day dining and ground floor bar is ongoing and expected to be completed by the end of October, 2016.
The fit out work for the VIP lounge and meeting rooms shall commence by the end of September, 2016 and should be completed by the end of November, 2016.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the agreed schedule with the operator.
The order for the commercial kitchen equipment has been issued. Delivery and installation will require a maximum of 3 months from the 1st of September, 2016.
More Information
Civil Defense completion certificate was issued.
Tecom’s completion certificate was obtained.
The building has permanent power connected now.
The AC testing and commissioning has commenced.
The snagging and de snagging process is ongoing.
The delivery and installation of the rooms’ furniture will start during the second week of October, 2016 as the floors will partially be handed over from the top floors going downwards; the full process should be completed latest by December, 2016.
The fit out work for the main lobby, all day dining and ground floor bar is ongoing and expected to be completed by the end of October, 2016.
The fit out work for the VIP lounge and meeting rooms shall commence by the end of September, 2016 and should be completed by the end of November, 2016.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the agreed schedule with the operator.
The order for the commercial kitchen equipment has been issued. Delivery and installation will require a maximum of 3 months from the 1st of September, 2016.
The AC testing and commissioning is ongoing. Expected to be completed by the first week of December, 2016.
The snagging and de snagging process is ongoing. Expected to be completed by the first week of December, 2016.
The delivery and installation of the rooms’ furniture has commenced; the full process should be completed by December, 2016.
The fit out work for the main lobby, all day dining and ground floor bar is ongoing and expected to be completed by the end of November, 2016.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the agreed schedule with the operator.
The delivery and installation of the commercial kitchen equipment will commence during the month of November, 2016.
90% of the AC testing and commissioning have been completed. Expected to be completed by the first week of December, 2016.
95% of the snagging and de snagging process has been completed. Expected to be completed by the first week of December, 2016.
The delivery and installation of the rooms’ furniture has commenced; the full process should be completed during December, 2016.
The fit out work for the main lobby, all day dining and ground floor bar has been completed; the contractor is working on the snags for these areas; expected to be completed by the end of December, 2016.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the agreed schedule with the operator.
The delivery and installation of the commercial kitchen equipment has commenced.
The AC testing and commissioning has been completed.
The snagging and de snagging of the building has been completed.
The delivery and installation of the rooms’ furniture has commenced; 75% of the process has already been completed. We expect to have all hotel rooms furnished by the end of January, 2107.
The fit out work for the main lobby, all day dining and ground floor bar has been completed.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has commenced and is expected to be completed by the end of January 2017.
More Information
The AC testing and commissioning has been completed.
The snagging and de snagging of the building has been completed.
All the hotel’s rooms have been completely furnished.
A new café and Pastry lounge has been introduced by our Food and Beverage consultant which has the operator’s approval. The fit out work required for the new outlet will commence shortly.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has commenced and is expected to be completed and tested by the end of February 2017.
All the hotel’s rooms have been completely furnished and the snagging process is ongoing.
The fit out work required for the new outlet café and Pastry lounge has commenced.
The fit out work required for the VIP Lounge and outdoor trace has commenced.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has been completed. The snagging process has commenced.
All the hotel’s rooms have been completely furnished and the final snagging process is ongoing.
60% of the fit out work required for the new café and Pastry lounge has been completed.
25% of the fit out work required for the VIP Lounge and outdoor terrace has been completed.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has been completed. The snagging process has commenced.
Opening is scheduled for early July, 2017.
More Information
All the hotel’s rooms have been completely furnished and the final snagging process is ongoing.
60% of the fit out work required for the new café and Pastry lounge has been completed.
25% of the fit out work required for the VIP Lounge and outdoor terrace has been completed.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has been completed. The snagging process has commenced.
Opening is scheduled for early July, 2017.
All the hotel’s rooms have been completely furnished and 85% of the final snagging process has been completed.
90%of the fit out work required for the new café and Pastry lounge has been completed.
75% of the fit out work required for the VIP Lounge and outdoor terrace has been completed.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has been completed. 85% of the snagging process has been commenced.
Soft opening is scheduled during July, 2017.
All the hotel’s rooms have been completely furnished and the final snagging has been completed.
98%of the fit out work required for the new Café and Pastry Lounge has been completed.
90% of the fit out work required for the VIP Lounge and outdoor terrace has been completed.
All OS&E items (operation, supplies and equipment) have been ordered and delivery of the items will be according to the schedule agreed with the operator.
The delivery and installation of the commercial kitchen equipment has been completed. 95% of the snagging process has been commenced.
Soft opening is scheduled during July, 2017.
The fit work at the lobby area has been completed. Snagging work is ongoing.
The fit out work in all the food and beverages outlets have been completed. Snagging work is ongoing.
The lobby and food and beverages outlets furniture have been delivered.
Soft opening is scheduled for end July, 2017.
More Information
The fit work at the lobby area has been completed. Snagging work is ongoing.
The fit out work in all the food and beverages outlets have been completed. Snagging work is ongoing.
The lobby and food and beverages outlets furniture have been delivered.
Soft opening is scheduled for end July, 2017.
The hotel has been handed over to the operator.
Why invest in Barsha Heights?
AN URBAN OASIS SITUATED IN ONE OF DUBAI’S BEST LOCATIONS
Barsha Heights is renowned as one of Dubai’s most accessible districts, close to prime commercial centres and tourist attractions, and well-served by the city’s major transportation links.